Stella Construction & Engineering played an integral role in FIJI Water’s $140 million expansion project at Yaqara as the key local contractor, which increased the facility’s bottling capacity and modernized key production systems.
Our scope of work covered a range of mechanical, structural, and installation activities, including assisting equipment manufacturers and overseas technicians with the installation and relocation of conveyor and cap systems, dismantling and removal of existing blowers, fillers, resin tanks, and dryers, and installing new equipment such as chiller units and dryer systems.
We also fabricated and installed platforms, and cable trays, carried out pipework modifications for the chilled-water system, and managed the removal and reinstallation of large-scale components.
The project demonstrated our ability to support high-value industrial installations through precision work, safe operations, and efficient coordination with international equipment suppliers.